Short Boards

ProWood® short boards provide a convenient, project-ready solution for small outdoor builds and repairs. Each board is pressure treated for long-term durability in above-ground applications, making them ideal for planters, accents, small structures, edging, and other DIY or professional tasks that need dependable material in manageable lengths.

Find a Dealer

‍

‍

‍

Man wearing safety glasses marking wood with pencil while working in a workshop.

‍

No items found.
Previous
Next

Features & Benefits

Discover the features and benefits of ProWood products

00
00
00

Consistent Quality

ProWood products are consistently manufactured for quality, straightness, and uniform sizing to reduce headaches and support an easy and clean installation.

Yellow level tool on wooden deck joists under construction by a lakeside with trees in background.

Multiple Sizes & Profiles

ProWood products are available in a wide range of sizes, lengths, and profiles to support efficient, precise builds.

Gloved hand marks measurement on PROWOOD lumber using a pencil and tape measure.

Quicker Installation

ProWood products, kits, hardware, and accessories can help you work faster, better, and with less waste, which amounts to less time on the build.

Man wearing gloves and cap installs a wooden post into a deck frame outdoors in a green yard.

Short Boards

Knowledge for Every Project

Resources
FAQ
No items found.
No items found.

Related

Explore more ProWood Products

Find similar and related ProWood products

Person in gloves measuring a sheet of plywood with a tape measure in a workshop.

Plywood

Person reviewing a wood structure plan on tablet and sketchpad with measurements on a wooden table.

Project Panels

Construction worker in blue hard hat carrying wooden planks at a building site with wood framing.

Construction Lumber

Connect with a ProWood Dealer

Find a Dealer
A stack of redwood toned TrueFrame Joists.